Message id | Publication date UTC | Start date UTC | End date UTC | Event status | Umm type | Market participant | Affected asset | Unavailable | Remarks | Actions | Id |
---|---|---|---|---|---|---|---|---|---|---|---|
22-0427A0002237K.PL-00173_001 | 2022-04-27 06:22:52 | 2022-04-27 06:17 | Active | OTHER | PGNiG SA A0002237K.PL [ace] | Please be informed, that on 27th of April 2022, 6:17 (UTC) PAO Gazprom/OOO Gazprom Export („Gazprom”) interrupted deliveries under the Contract for the purchase and sale of natural gas to the Republic of Poland dated September 25th 1996 („Yamal co... | {7853} | ||||
22-0427A0002237K.PL-00174_001 | 2022-04-27 06:23:26 | 2022-04-27 06:08 | Active | OTHER | PGNiG SA A0002237K.PL [ace] | Please be informed, that on 27th of April 2022, 6:08 (UTC) PAO Gazprom/OOO Gazprom Export („Gazprom”) interrupted deliveries under the Contract for the purchase and sale of natural gas to the Republic of Poland dated September 25th 1996 („Yamal co... | {7854} | ||||
22-0427A0002237K.PL-00175_001 | 2022-04-27 06:24:09 | 2022-04-27 06:02 | Active | OTHER | PGNiG SA A0002237K.PL [ace] | Please be informed, that on 27th of April 2022, 6:02 (UTC) PAO Gazprom/OOO Gazprom Export („Gazprom”) interrupted deliveries under the Contract for the purchase and sale of natural gas to the Republic of Poland dated September 25th 1996 („Yamal co... | {7855} | ||||
22-0427A0002237K.PL-00176_001 | 2022-04-27 06:24:38 | 2022-04-27 06:03 | Active | OTHER | PGNiG SA A0002237K.PL [ace] | Please be informed, that on 27th of April 2022, 6:03 (UTC) PAO Gazprom/OOO Gazprom Export („Gazprom”) interrupted deliveries under the Contract for the purchase and sale of natural gas to the Republic of Poland dated September 25th 1996 („Yamal co... | {7856} | ||||
25-0209A0002323R.PL-00043_001 | 2025-02-09 12:26:45 | 2025-02-09 12:05 | Active | OTHER | PSE SA A0002323R.PL [ace] | O godz. 13:05 dn. 09.02.2025 zsynchronizowano systemy Państw Bałtyckich (Litwa, Łotwa i Estonia) z systemem Kontynentalnej Europy.Baltic State power systems started synchronous operation with Continental Europe Synchronous Area. | {22058} | ||||
24-0612A0002323R.PL-00399_001 | 2024-06-12 12:59:12 | 2024-06-12 14:58 | Active | OTHER | PSE SA A0002323R.PL [ace] | W związku z wdrażaniem od 14.06.2024 roku nowych zasad rynku bilansującego, mogą przejściowo występować opóźnienia w raportowaniu informacji rynkowych. PSE będą na bieżąco reagować na ewentualne problemy w celu terminowego raportowania informacji.... | {16227} | ||||
24-0702A0002323R.PL-00474_001 | 2024-07-02 17:10:24 | 2024-07-02 19:00 | Active | OTHER | PSE SA A0002323R.PL [ace] | Komunikat o korekcie cen mocy bilansujących zintegrowanego procesu grafikowania dla doby handlowej 1 lipca 2024 r.PSE S.A. informują, że została dokonana korekta cen mocy bilansujących nabytych w trybie uzupełniającym w ramach zintegrowanego pro... | {16754} | ||||
24-0702A0002323R.PL-00475_001 | 2024-07-02 17:10:43 | 2024-07-02 19:00 | Active | OTHER | PSE SA A0002323R.PL [ace] | Announcement of balancing capacity price correction of integrated scheduling process for July 1, 2024.PSE S.A. informs that balancing capacity prices obtained in the supplementary balancing capacity procurement process within the framework of in... | {16755} | ||||
24-0613A0002323R.PL-00405_001 | 2024-06-13 14:37:03 | 2024-06-13 14:36 | Active | OTHER | PSE SA A0002323R.PL [ace] | Informujemy o pojawiających się problemach w zakresie publikacji na Platformie ENTSO-E. PSE S.A. na bieżąco reagują na ewentualne usterki w celu terminowej publikacji informacji. | {16256} | ||||
24-0613A0002323R.PL-00406_001 | 2024-06-13 17:25:35 | 2024-06-13 17:25 | Active | OTHER | PSE SA A0002323R.PL [ace] | Informujemy o pojawiających się problemach w zakresie publikacji na https://raporty.pse.pl/PSE S.A. na bieżąco reagują na ewentualne usterki w celu terminowej publikacji informacji. | {16257} | ||||
24-0614A0002323R.PL-00411_001 | 2024-06-14 09:53:00 | 2024-06-14 09:52 | Active | OTHER | PSE SA A0002323R.PL [ace] | PSE S.A. przypominają, że wraz z początkiem 14.06.2024 r. uległy zmianie wymagania informacyjne dotyczące rynku energii elektrycznej i pracy KSE.Wszystkie nowe i zmodyfikowane raporty dostępne są pod adresem: https://raporty.pse.plRaporty ... | {16266} | ||||
23-0502A0002323R.PL-00226_001 | 2023-05-02 09:48:11 | 2023-05-02 11:39 | Active | OTHER | PSE SA A0002323R.PL [ace] | Komunikat o planowanym uruchomieniu połączenia Polska - UkrainaOSP informuje o uruchomieniu połączenia 400 kV Rzeszów - Chmielnicka EJ oraz rozpoczęciu przetargu na zdolności przesyłowe na część połączenia od punktu zlokalizowanego na granicy po... | {11912} | ||||
23-1002A0002323R.PL-00490_001 | 2023-10-02 18:24:28 | 2023-10-02 18:14 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na problemy techniczne systemów informatycznych CEPS w dniu 02.10.2023 r. od 20:14 zawieszono proces Jednolitego łączenia Rynków Dnia Bieżącego (SIDC) na granicach: Czechy-Polska (CEPS-PSE). Kolejna wiadomość zostanie wys... | {13244} | ||||
23-1002A0002323R.PL-00491_001 | 2023-10-02 19:09:19 | 2023-10-02 19:00 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z problemy techniczne systemów informatycznych CEPS zostały rozwiązane. W dniu 02.10.2023 r. od 21:00 przywrócono proces Jednolitego łączenia Rynków Dnia Bieżącego (SIDC) na granicach: Czechy-Polska (CEPS-PSE).TSO announcement... | {13245} | ||||
23-0116A0001943E.PL-00024_002 | 2023-01-16 12:55:36 | 2023-01-16 11:20 | Active | OTHER | PGNiG TERMIKA SA A0001943E.PL [ace] | Ograniczenia zdolności konsumpcji gazu występujące w zakładzie EC Żerań będą odtąd publikowane z użyciem kodu EIC 19W000000000229Z, a nie jak do tej pory - 53ZPL0000590900F. Komunikaty zgłoszone na rok 2023 zostaną zaktualizowane.UMMs for EC Ż... | {10787} | ||||
22-0902A0002323R.PL-00412_001 | 2022-09-02 14:34:11 | 2022-09-02 16:34 | Active | OTHER | PSE SA A0002323R.PL [ace] | PSE S.A., acting as Auction Office, informs that on 2nd September 2022 starts the unilateral auction for period from 7th September to 18th September 2022 as an addendum to the process of a unilateral monthly auction for the transmission capacity o... | {9358} | ||||
22-1102A0002323R.PL-00562_001 | 2022-11-02 11:27:58 | 2022-11-01 18:35 | Active | OTHER | PSE SA A0002323R.PL [ace] | PSE informują, że wznowiona została publikacja UMM dot. niedostępności infrastruktury sieciowej oraz UMM inne informacje rynkowe na platformie Gas Inside Information Platform GIIP https://www.gasinsideinformationplatform.pl/. Publikacje na platfor... | {10190} | ||||
23-0605A0002323R.PL-00282_001 | 2023-06-05 13:29:45 | 2023-06-05 00:00 | Active | OTHER | PSE SA A0002323R.PL [ace] | PSE S.A. acting as Auction Office, informs about update of document: “Rules for monthly auctions of transmission capacity on 400 kV line Rzeszów-Chmielnicka - PSE S.A. and NEK UKRENERGO cross border interconnection, organized unilaterally by PSE ... | {12260} | ||||
25-0321A0002323R.PL-00169_001 | 2025-03-21 10:36:09 | 2025-03-21 10:34 | Active | OTHER | PSE SA A0002323R.PL [ace] | Informujemy, że zgodnie z komunikatem OSP z dn. 14 marca 2025 r. dotyczącym cen na rynku bilansującym, 21 marca 2025 r. w algorytmie optymalizacji służącym do wyznaczania pasm mocy na potrzeby tworzenia planu BPKD/BO została wdrożona poprawka w za... | {22791} | ||||
23-0423A0002323R.PL-00210_003 | 2023-04-23 08:00:12 | 2023-04-23 09:00 | Active | OTHER | PSE SA A0002323R.PL [ace] | PSE S.A. stwierdzają wystąpienie zagrożenia bezpieczeństwa dostaw energii elektrycznej w rozumieniu art. 3 pkt 16d) ustawy Prawo energetyczne od godziny 11:00 dnia 23.04.2023. TSO announcement on the occurrence of a serious risk of failure to ... | {11846} | ||||
23-0613A0002323R.PL-00292_001 | 2023-06-13 16:14:53 | 2023-06-13 16:00 | Active | OTHER | PSE SA A0002323R.PL [ace] | PSE S.A. informs that on 13th June 2023 starts the unilateral additional auction for period 19th -30th June 2023 as an addendum to the process of a unilateral monthly auction for the transmission capacity of the line Rzeszów-Chmielnicka (PSE S.A. ... | {12294} | ||||
23-0423A0002323R.PL-00211_001 | 2023-04-23 15:03:47 | 2023-04-23 15:00 | Active | OTHER | PSE SA A0002323R.PL [ace] | Komunikat OSP o zakończeniu zagrożenia bezpieczeństwa dostaw energii elektrycznejPSE S.A. informują, że o godzinie 17:00 w dniu 23.04.2023. zakończyło się zagrożenie bezpieczeństwa dostaw energii elektrycznej w rozumieniu art. 3 pkt 16d) ustawy P... | {11847} | ||||
24-0603A0001079H.PL-00368_001 | 2024-06-03 14:17:18 | 2025-01-01 05:00 | 2026-01-01 04:59 | Active | OTHER | GAZ-SYSTEM S.A. A0001079H.PL [ace] | The President of the ERO approved on June, 3 2024 “Tariff No 1/2025 for gaseous fuels transmission of the Polish Section of the Transit Gas Pipeline System Yamal – Europe “ which will be applicable as 1.01.2025. For access to the full text of t... | {16101} | |||
23-0711A0002323R.PL-00336_001 | 2023-07-11 12:55:38 | 2023-07-11 12:55 | Active | OTHER | PSE SA A0002323R.PL [ace] | PSE S.A. informs that on 11th July 2023 starts the unilateral additional auction for period 17th -31st July 2023 as an addendum to the process of a unilateral monthly auction for the transmission capacity of the line Rzeszów-Chmielnicka (PSE S.A. ... | {12520} | ||||
25-0314A0002323R.PL-00157_001 | 2025-03-14 14:47:19 | 2025-03-14 14:46 | Active | OTHER | PSE SA A0002323R.PL [ace] | Informujemy, że zgodnie z komunikatem OSP z dn. 14 marca 2025 r. dotyczącym cen na rynku bilansującym, w algorytmie optymalizacji służącym do wyznaczania pasm mocy na potrzeby tworzenia planu BPKD/BO oraz wyznaczania wielkości rezerwy operacyjnej:... | {22748} | ||||
24-0603A0001079H.PL-00367_001 | 2024-06-03 14:13:03 | 2025-01-01 05:00 | 2026-01-01 04:59 | Active | OTHER | GAZ-SYSTEM S.A. A0001079H.PL [ace] | The President of the ERO approved on June 3, 2023 “Tariff for Transmission of Gaseous Fuels No. 18”, which will be applicable as 1.01.2025. For access to the Decision of the President of the Energy Regulatory Office and the full text of the Tar... | {16100} | |||
25-0228A0002323R.PL-00070_001 | 2025-02-28 15:14:41 | 2025-02-28 15:06 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje o nieplanowanym zawieszeniu procesu Jednolitego łączenia Rynku Dnia Bieżącego w dniu 28.02.2025 od godz. 16.06 (CET) na przekroju handlowych z: Niemcy - Polska (50HzT-PSE).TSO announcement on the suspension of the Single Intra-Day ... | {22492} | ||||
24-0926A0002323R.PL-00714_001 | 2024-09-26 08:01:02 | 2024-09-27 00:00 | Active | OTHER | PSE SA A0002323R.PL [ace] | As of 27.09.2024, the way of publishing data on non-market redispatching of RES will be changed. Data on the amount of reductions in a given quarter by source type and reason for redisatching will be available at https://raporty.pse.pl/?report=POZ... | {19329} | ||||
24-0926A0002323R.PL-00713_001 | 2024-09-26 07:53:51 | 2024-09-27 00:00 | Active | OTHER | PSE SA A0002323R.PL [ace] | Od 27.09.2024 zmieniony zostanie sposób publikacji danych o nierynkowym redysponowaniu źródeł OZE. Dane o wielkości redukcji w danym kwadransie w podziale na rodzaj źródeł oraz przyczynę redysponowania będą dostępne na stronie https://raporty.pse.... | {19328} | ||||
24-1031A0002323R.PL-00773_001 | 2024-10-31 11:36:51 | 2024-10-31 12:30 | Active | OTHER | PSE SA A0002323R.PL [ace] | Informujemy, że zgodnie z komunikatem OSP z dn. 25 października 2024 r. dotyczącym cen na rynku bilansującym, 31 października 2024 r. w algorytmie optymalizacji służącym do wyznaczania pasm mocy na potrzeby tworzenia planu BPKD/BO oraz wyznaczania... | {20175} | ||||
24-1217A0001079H.PL-00958_001 | 2024-12-17 15:19:24 | 2025-01-01 05:00 | 2026-01-01 05:00 | Active | OTHER | GAZ-SYSTEM S.A. A0001079H.PL [ace] | The President of the ERO approved on 16.12.2024 “Tariff No 10 for LNG regasification services of the Gas Transmission Operator GAZ-SYSTEM S.A.", which will be applicable as 1.01.2025. For access to the Decision of the President of the Energy Regul... | {20823} | |||
24-1223A0001079H.PL-00964_001 | 2024-12-23 11:10:13 | 2025-01-01 05:00 | Active | OTHER | GAZ-SYSTEM S.A. A0001079H.PL [ace] | By a new Decision dated 20 December 2024, the ERO President decided that the LNG Terminal Instruction will be effective as of 1.01.2025. For access to the new ERO President's Decision and the full text of the LNG Terminal Code, please visit the ... | {20841} | ||||
24-1223A0002323R.PL-00966_001 | 2024-12-23 15:40:54 | 2024-12-23 15:35 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z problemy techniczne systemów informatycznych SEPS zostały rozwiązane. W dniu 23.12.2024r. od 16:35 przywrócono proces Jednolitego łączenia Rynków Dnia Bieżącego (SIDC) na granicy: Słowacja-Polska (SEPS-PSE).TSO announcement o... | {20843} | ||||
24-1223A0002323R.PL-00965_001 | 2024-12-23 15:11:32 | 2024-12-23 14:51 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na problemy techniczne systemów informatycznych SEPS w dniu 23.12.2024r. od 15:51 zawieszono proces Jednolitego łączenia Rynków Dnia Bieżącego (SIDC) na granicy: Słowacja-Polska (SEPS-PSE). Kolejna wiadomość zostanie wysł... | {20842} | ||||
24-0804A0002323R.PL-00601_001 | 2024-08-04 00:08:39 | 2024-08-03 23:50 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na problemy techniczne systemów informatycznych PSE w dniu 04.08.2024 r. od 01:50 zawieszono proces Jednolitego łączenia Rynków Dnia Bieżącego (SIDC) na granicach: Niemcy - Polska (50HzT-PSE), Czechy-Polska (CEPS-PSE), Sł... | {17752} | ||||
25-0508A0001079H.PL-00245_001 | 2025-05-08 12:23:10 | 2025-06-01 04:00 | Active | OTHER | GAZ-SYSTEM S.A. A0001079H.PL [ace] | GAZ-SYSTEM S.A. hereby informs that as of 1st June 2025 the virtual reverse service at Point of Interconnection (PWP), EIC 21Z000000000399Z will not be available. Instead of this the physical flow will be offered.The daily firm capacity at Point... | {23324} | ||||
25-0616A0002323R.PL-00327_001 | 2025-06-16 14:01:12 | 2025-06-16 14:00 | Active | OTHER | PSE SA A0002323R.PL [ace] | Informujemy, że zgodnie z komunikatem OSP z dn. 16 czerwca 2025 r. dotyczącym cen na rynku bilansującym zostały wdrożone poprawki w zakresie:1. Wyznaczania wielkości aktywowanych mocy bilansujących mFRRd.2. Algorytmu optymalizacji służąceg... | {23967} | ||||
25-0703A0002323R.PL-00382_001 | 2025-07-03 11:35:06 | 2025-07-03 11:34 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że w związku z wystąpieniem zakłóceń w pracy systemów informatycznych mogą pojawić się opóźnienia w publikacji danych o pracy systemu. Pracujemy nad rozwiązaniem problemu. Odrębnym komunikatem poinformujemy o ich usunięciu. | {24506} | ||||
25-0619A0002323R.PL-00344_001 | 2025-06-19 20:21:00 | 2025-06-19 18:06 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje o nieplanowanym zawieszeniu procesu Jednolitego łączenia Rynku Dnia Bieżącego w dniu 19.06.2025 od godz. 22:06 (CET) na przekrojach handlowych z: Słowacja-Polska (SEPS-PSE).TSO announcement on the suspension of the Single Intra-D... | {24053} | ||||
25-0627A0001079H.PL-00369_002 | 2025-06-27 11:54:30 | 2025-08-01 04:00 | 2026-10-01 03:59 | Active | OTHER | GAZ-SYSTEM S.A. A0001079H.PL [ace] | GAZ-SYSTEM S.A. hereby informs that from 1st August 2025 the firm capacity of the connection point “GCP GAZ-SYSTEM/UA TSO” in the direction from Poland to Ukraine (exit) will be available in the amount of:*Up to 3 390 000 kWh/h (300 000 m3/h) ... | {24269} | |||
25-0703A0002323R.PL-00384_001 | 2025-07-03 15:10:59 | 2025-07-03 15:10 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że zakłócenia w pracy systemów informatycznych OSP zostały usunięte. Przepraszamy za niedogodności z tym związane. | {24510} | ||||
24-1025A0002323R.PL-00768_001 | 2024-10-25 12:23:44 | 2024-10-25 00:00 | Active | OTHER | PSE SA A0002323R.PL [ace] | PSE S.A. zawiadamiają, że w toku weryfikacji rozliczeń na rynku bilansującym wykryto nieprawidłowości w procesie przygotowania danych do rozliczeń, skutkujące w określonych przypadkach zawyżonymi lub zaniżonymi wartościami cen energii bilansującej... | {20075} | ||||
25-0606A0001079H.PL-00305_001 | 2025-06-06 06:11:32 | 2026-01-01 05:00 | 2027-01-01 04:59 | Active | OTHER | GAZ-SYSTEM S.A. A0001079H.PL [ace] | The President of the ERO approved on June 5, 2025 “Tariff for Transmission of Gaseous Fuels No. 19”, which will be applicable as 1.01.2026. For access to the Decision of the President of the Energy Regulatory Office and the full text of the Tar... | {23792} | |||
25-0606A0001079H.PL-00306_001 | 2025-06-06 06:11:36 | 2026-01-01 05:00 | 2027-01-01 04:59 | Active | OTHER | GAZ-SYSTEM S.A. A0001079H.PL [ace] | The President of the ERO approved on June 5, 2025 “Tariff No 1/2026 for gaseous fuels transmission of the Polish Section of the Transit Gas Pipeline System Yamal – Europe “ which will be applicable as 1.01.2026. For access to the full text of t... | {23793} | |||
25-0915A0001079H.PL-00532_001 | 2025-09-15 13:51:58 | 2025-09-17 07:00 | Active | OTHER | GAZ-SYSTEM S.A. A0001079H.PL [ace] | Due to technical issues on eustream IT system the capacity for monthly auction for October 2025 was not uploaded into GSA Platform – thereto no bundled capacity product for October 2025 at IP Vyrava was offered on September 15, 2025. Eustream a... | {26759} | ||||
25-0912A0002323R.PL-00526_001 | 2025-09-12 08:28:52 | 2025-09-18 14:15 | 2025-09-18 18:00 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na zaplanowane prace modernizacyjne systemów informatycznych SEPS w dniu 18.09.2025 r. w godz. od 16:15 do 20:00 (CET), planowane jest zawieszenie procesu Jednolitego łączenia Rynków Dnia Bieżącego (SIDC) na granicy Słowa... | {26705} | |||
25-0912A0002323R.PL-00525_001 | 2025-09-12 07:56:51 | 2025-09-12 07:56 | Active | OTHER | PSE SA A0002323R.PL [ace] | Informujemy, że zgodnie z komunikatem OSP z dn. 12 września 2025 r. dotyczącym cen na rynku bilansującym zostały wdrożone poprawki w zakresie wyznaczania dodatkowych pasm mocy z przyjętych OEB uwzględnianych przy tworzeniu planu BPKD/BO na podstaw... | {26704} | ||||
25-0311A0001943E.PL-00091_001 | 2025-03-11 12:05:08 | 2025-10-05 22:01 | 2025-10-31 23:00 | Active | GAS | ORLEN TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 276 000 [kWh/h] | {22605} | ||
25-0312A0001943E.PL-00101_001 | 2025-03-12 07:08:02 | 2027-03-31 22:01 | 2027-05-20 22:00 | Active | GAS | ORLEN TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 276 000 [kWh/h] | {22625} | ||
25-0312A0001943E.PL-00124_001 | 2025-03-12 12:36:33 | 2029-03-31 22:01 | 2029-05-17 22:00 | Active | GAS | ORLEN TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 276 000 [kWh/h] | {22671} | ||
25-0312A0001943E.PL-00123_001 | 2025-03-12 11:47:40 | 2028-09-10 22:01 | 2028-10-31 23:00 | Active | GAS | ORLEN TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 276 000 [kWh/h] | {22669} | ||
25-0312A0001943E.PL-00136_001 | 2025-03-12 12:46:53 | 2029-09-09 22:01 | 2029-10-31 23:00 | Active | GAS | ORLEN TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 276 000 [kWh/h] | {22695} | ||
25-0313A0001943E.PL-00137_001 | 2025-03-13 07:41:04 | 2030-03-31 22:01 | 2030-05-17 22:00 | Active | GAS | ORLEN TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 276 000 [kWh/h] | {22698} | ||
25-0311A0001943E.PL-00092_003 | 2025-07-29 09:16:47 | 2026-03-31 22:00 | 2026-04-29 22:00 | Active | GAS | ORLEN TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 276 000 [kWh/h] | {25359} | ||
25-0311A0001943E.PL-00094_003 | 2025-07-29 09:30:35 | 2026-05-31 22:00 | 2026-06-30 22:00 | Active | GAS | ORLEN TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 453 000 [kWh/h] | {25365} | ||
25-0312A0001943E.PL-00103_002 | 2025-07-19 09:05:13 | 2027-05-20 22:00 | 2027-06-30 22:00 | Active | GAS | ORLEN TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 453 000 [kWh/h] | {25243} | ||
25-0311A0001943E.PL-00095_003 | 2025-07-29 09:28:41 | 2026-06-30 22:00 | 2026-08-16 22:00 | Active | GAS | ORLEN TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 1 460 000 [kWh/h] | {25364} | ||
25-0312A0001943E.PL-00118_002 | 2025-07-19 10:44:00 | 2028-07-27 22:00 | 2028-08-18 22:00 | Active | GAS | ORLEN TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 1 321 000 [kWh/h] | {25248} | ||
25-0311A0001943E.PL-00093_003 | 2025-07-29 09:33:24 | 2026-04-29 22:00 | 2026-05-30 22:00 | Active | GAS | ORLEN TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 314 000 [kWh/h] | {25366} | ||
25-0729A0001943E.PL-00433_001 | 2025-07-29 09:34:59 | 2026-05-30 22:00 | 2026-05-31 22:00 | Active | GAS | ORLEN TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 767 000 [kWh/h] | {25367} | ||
25-0719A0001943E.PL-00418_001 | 2025-07-19 10:45:46 | 2028-07-02 22:00 | 2028-07-27 22:00 | Active | GAS | ORLEN TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 1 007 000 [kWh/h] | {25249} | ||
25-0312A0001943E.PL-00114_002 | 2025-07-19 10:50:46 | 2028-05-18 22:00 | 2028-07-02 22:00 | Active | GAS | ORLEN TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 453 000 [kWh/h] | {25254} | ||
25-0312A0001943E.PL-00112_002 | 2025-07-19 10:51:17 | 2028-03-31 22:00 | 2028-05-18 22:00 | Active | GAS | ORLEN TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 276 000 [kWh/h] | {25255} | ||
25-0311A0001943E.PL-00100_003 | 2025-07-29 09:18:36 | 2026-09-30 22:00 | 2026-10-31 23:00 | Active | GAS | ORLEN TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 276 000 [kWh/h] | {25360} | ||
25-0311A0001943E.PL-00097_003 | 2025-07-29 09:20:38 | 2026-09-01 22:00 | 2026-09-30 22:00 | Active | GAS | ORLEN TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 314 000 [kWh/h] | {25361} | ||
25-0312A0001943E.PL-00122_002 | 2025-07-19 10:41:06 | 2028-08-18 22:00 | 2028-09-10 22:00 | Active | GAS | ORLEN TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 314 000 [kWh/h] | {25244} | ||
25-0312A0001943E.PL-00110_002 | 2025-07-19 08:55:27 | 2027-08-16 22:00 | 2027-09-12 22:00 | Active | GAS | ORLEN TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 314 000 [kWh/h] | {25235} | ||
25-0312A0001943E.PL-00111_002 | 2025-07-19 08:55:48 | 2027-09-12 22:00 | 2027-10-31 23:00 | Active | GAS | ORLEN TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 276 000 [kWh/h] | {25236} | ||
25-0311A0001943E.PL-00098_003 | 2025-07-29 09:23:43 | 2026-08-17 22:00 | 2026-09-01 22:00 | Active | GAS | ORLEN TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 767 000 [kWh/h] | {25362} | ||
25-0729A0001943E.PL-00432_001 | 2025-07-29 09:26:06 | 2026-08-16 22:00 | 2026-08-17 22:00 | Active | GAS | ORLEN TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 453 000 [kWh/h] | {25363} | ||
25-0312A0001943E.PL-00108_002 | 2025-07-19 08:58:11 | 2027-07-29 22:00 | 2027-08-16 22:00 | Active | GAS | ORLEN TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 1 321 000 [kWh/h] | {25237} | ||
25-0312A0001943E.PL-00107_002 | 2025-07-19 08:59:42 | 2027-07-04 22:00 | 2027-07-29 22:00 | Active | GAS | ORLEN TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 1 007 000 [kWh/h] | {25239} | ||
25-0312A0001943E.PL-00105_002 | 2025-07-19 09:00:19 | 2027-06-30 22:00 | 2027-07-04 22:00 | Active | GAS | ORLEN TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 1 460 000 [kWh/h] | {25240} | ||
25-0609A0003247I.PL-00311_005 | 2025-08-24 10:06:55 | 2025-09-09 06:00 | 2025-09-18 06:00 | Active | GAS | Grupa Azoty Kędzierzyn SA A0003247I.PL [ace] | [53XPL000000ZAKED] Grupa Azoty ZAK S.A. | 671 400 [kWh/h] | {25850} | ||
25-0312A0001943E.PL-00135_002 | 2025-08-01 06:51:46 | 2029-08-18 22:01 | 2029-09-09 22:00 | Active | GAS | ORLEN TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 314 000 [kWh/h] | {25593} | ||
25-0908A0002835C.PL-00504_001 | 2025-09-08 10:27:53 | 2025-09-08 10:00 | 2025-12-31 11:00 | Active | GAS | Grupa Azoty Police SA A0002835C.PL [ace] | [53ZPL00007902368] Grupa Azoty Zakłady Chemiczne Police S.A. | 315 000 [kWh/h] | {26489} | ||
25-0313A0001943E.PL-00149_002 | 2025-08-01 08:32:36 | 2030-09-23 22:01 | 2030-10-31 23:00 | Active | GAS | ORLEN TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 276 000 [kWh/h] | {25594} | ||
25-0313A0001943E.PL-00148_002 | 2025-08-01 08:34:33 | 2030-08-21 22:01 | 2030-09-23 22:00 | Active | GAS | ORLEN TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 314 000 [kWh/h] | {25595} | ||
25-0910A0003319F.PL-00510_001 | 2025-09-10 08:26:46 | 2026-01-09 22:00 | 2026-01-19 23:00 | Active | GAS | ORLEN SA A0003319F.PL [ace] | [53ZPL00005902030] CCGT PŁOCK [Exit] | 1 506 600 [kWh/h] | {26635} | ||
25-0313A0001943E.PL-00147_002 | 2025-08-01 08:35:10 | 2030-08-09 22:01 | 2030-08-21 22:00 | Active | GAS | ORLEN TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 1 321 000 [kWh/h] | {25596} | ||
25-0910A0003319F.PL-00511_001 | 2025-09-10 12:58:07 | 2026-06-03 04:00 | 2026-06-27 16:00 | Active | GAS | PKN Orlen SA A0003319F.PL [ace] | [53ZPL0000772311M] Nitrogen Rejection Plant Grodzisk [Entry] | 452 000 [kWh/h] | {26647} | ||
25-0801A0001943E.PL-00448_001 | 2025-08-01 10:32:13 | 2031-07-01 22:01 | 2031-08-21 22:00 | Active | GAS | ORLEN TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 1 007 000 [kWh/h] | {25610} | ||
25-0821A0003247I.PL-00470_003 | 2025-08-24 10:02:25 | 2025-08-24 13:00 | 2025-09-09 06:00 | Active | GAS | Grupa Azoty Kędzierzyn SA A0003247I.PL [ace] | [53XPL000000ZAKED] Grupa Azoty ZAK S.A. | 629 400 [kWh/h] | {25822} | ||
25-0311A0001943E.PL-00089_002 | 2025-09-11 11:19:51 | 2025-09-04 22:01 | 2025-09-19 07:00 | Active | GAS | ORLEN TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 1 164 000 [kWh/h] | {26655} | ||
25-0801A0001943E.PL-00449_001 | 2025-08-01 10:34:01 | 2031-08-21 22:01 | 2031-10-05 22:00 | Active | GAS | ORLEN TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 314 000 [kWh/h] | {25611} | ||
25-0312A0001943E.PL-00128_002 | 2025-08-01 06:49:45 | 2029-05-17 22:01 | 2029-06-30 22:00 | Active | GAS | ORLEN TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 453 000 [kWh/h] | {25592} | ||
25-0423A0003319F.PL-00215_004 | 2025-08-31 22:22:01 | 2025-09-19 21:00 | 2025-09-27 00:00 | Active | GAS | ORLEN SA A0003319F.PL [ace] | [53ZPL00005902030] CCGT PŁOCK [Exit] | 1 506 600 [kWh/h] | {26133} | ||
25-0313A0001943E.PL-00143_002 | 2025-08-01 08:37:48 | 2030-06-30 22:01 | 2030-07-01 22:00 | Active | GAS | ORLEN TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 1 460 000 [kWh/h] | {25600} | ||
25-0313A0001943E.PL-00141_002 | 2025-08-01 08:39:52 | 2030-05-17 22:01 | 2030-06-30 22:00 | Active | GAS | ORLEN TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 453 000 [kWh/h] | {25605} | ||
25-0313A0001943E.PL-00145_002 | 2025-08-01 08:36:51 | 2030-07-01 22:01 | 2030-08-09 22:00 | Active | GAS | ORLEN TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 1 007 000 [kWh/h] | {25599} | ||
25-0801A0001943E.PL-00444_001 | 2025-08-01 10:24:02 | 2031-03-31 22:01 | 2031-05-17 22:00 | Active | GAS | ORLEN TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 276 000 [kWh/h] | {25606} | ||
25-0801A0001943E.PL-00446_001 | 2025-08-01 10:29:08 | 2031-05-17 22:01 | 2031-06-30 22:00 | Active | GAS | ORLEN TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 453 000 [kWh/h] | {25608} | ||
25-0801A0001943E.PL-00447_001 | 2025-08-01 10:30:51 | 2031-06-30 22:01 | 2031-07-01 22:00 | Active | GAS | ORLEN TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 1 460 000 [kWh/h] | {25609} | ||
25-0801A0001943E.PL-00445_001 | 2025-08-01 10:25:29 | 2031-10-05 22:01 | 2031-10-31 23:00 | Active | GAS | ORLEN TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 276 000 [kWh/h] | {25607} | ||
25-0312A0001943E.PL-00134_002 | 2025-08-01 06:45:20 | 2029-07-26 22:01 | 2029-08-18 22:00 | Active | GAS | ORLEN TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 1 321 000 [kWh/h] | {25544} | ||
25-0312A0001943E.PL-00132_002 | 2025-08-01 06:46:38 | 2029-07-01 22:01 | 2029-07-26 22:00 | Active | GAS | ORLEN TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 1 007 000 [kWh/h] | {25545} | ||
25-0708A0003247I.PL-00400_003 | 2025-08-13 18:55:36 | 2026-07-19 04:00 | 2026-08-30 04:00 | Active | GAS | Grupa Azoty Kędzierzyn SA A0003247I.PL [ace] | [53XPL000000ZAKED] Grupa Azoty ZAK S.A. | 671 400 [kWh/h] | {25751} | ||
25-0312A0001943E.PL-00130_002 | 2025-08-01 06:47:45 | 2029-06-30 22:01 | 2029-07-01 22:00 | Active | GAS | ORLEN TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 1 460 000 [kWh/h] | {25546} | ||
25-0902A0001079H.PL-00494_001 | 2025-09-02 15:27:12 | 2025-10-23 06:00 | 2025-10-25 06:00 | Active | GAS | GAZ-SYSTEM S.A. A0001079H.PL [ace] | [21Z000000000508J] GCP GAZ-SYSTEM/UA TSO [Exit] | 517 975 [kWh/h] | {26142} | ||
25-0902A0001079H.PL-00495_001 | 2025-09-02 15:28:07 | 2025-10-20 06:00 | 2025-10-23 06:00 | Active | GAS | GAZ-SYSTEM S.A. A0001079H.PL [ace] | [21Z000000000508J] GCP GAZ-SYSTEM/UA TSO [Exit] | 3 390 000 [kWh/h] | {26208} | ||
25-0912A0002296G.PL-00527_001 | 2025-09-12 18:57:08 | 2025-09-12 20:00 | 2026-04-01 04:00 | Active | GAS | Grupa Azoty SA A0002296G.PL [ace] | [53XPL000000ZATAV] Grupa Azoty S.A. | 125 000 [kWh/h] | Zmniejszenie zużycia z 420 000 kWh/h na 295 000 kWh/h | {26709} | |
25-0911A0001943E.PL-00524_002 | 2025-09-15 10:07:13 | 2025-09-22 08:01 | 2025-09-23 03:00 | Active | GAS | ORLEN TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań [Entry] | 1 321 000 [kWh/h] | {26750} | ||
25-0911A0001943E.PL-00523_002 | 2025-09-15 10:09:24 | 2025-09-21 07:01 | 2025-09-22 08:00 | Active | GAS | ORLEN TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań [Entry] | 314 000 [kWh/h] | {26751} | ||
25-0911A0001943E.PL-00520_003 | 2025-09-15 10:20:15 | 2025-09-19 12:01 | 2025-09-20 09:00 | Active | GAS | ORLEN TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań [Entry] | 276 000 [kWh/h] | {26755} | ||
25-0911A0001943E.PL-00522_003 | 2025-09-15 10:22:00 | 2025-09-20 13:01 | 2025-09-21 07:00 | Active | GAS | ORLEN TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań [Entry] | 617 000 [kWh/h] | {26771} | ||
25-0915A0001943E.PL-00529_001 | 2025-09-15 10:23:27 | 2025-09-20 09:01 | 2025-09-20 13:00 | Active | GAS | ORLEN TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 446 000 [kWh/h] | {26772} | ||
25-0915A0001943E.PL-00530_001 | 2025-09-15 10:26:27 | 2025-09-19 07:01 | 2025-09-19 12:00 | Active | GAS | ORLEN TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 718 000 [kWh/h] | {26773} | ||
25-0311A0001943E.PL-00090_003 | 2025-09-15 10:07:46 | 2025-09-23 03:01 | 2025-10-05 22:00 | Active | GAS | ORLEN TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 314 000 [kWh/h] | {26749} | ||
25-0725A0002323R.PL-00429_056 | 2025-09-15 06:47:41 | 2025-08-28 05:00 | 2025-09-21 19:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000001328X] Linia 400kV Słupsk Wierzbięcino-Żarnowiec tor 1 | 1 039 [MW] 1 039 [MW] 1 039 [MW] 1 039 [MW] 1 039 [MW] 1 039 [MW] 1 039 [MW] 1 039 [MW] 1 039 [MW] 1 039 [MW] | Utrzymanie | {26742} | |
24-1129A0002323R.PL-00918_004 | 2025-06-02 07:25:02 | 2025-10-06 04:00 | 2025-10-10 18:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T1100000068159] Linia 400 kV Ostrołęka - Stanisławów | 1 559 [MW] 1 559 [MW] 1 559 [MW] 1 559 [MW] 1 559 [MW] | Utrzymanie | {23719} | |
25-0627A0002323R.PL-00368_103 | 2025-08-24 04:59:08 | 2025-06-30 16:00 | 2025-12-31 22:59 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-DE-PL-000039] Linia 400 kV Krajnik-Vierraden tor 2 | 1 039 [MW] | Inne | {25849} | |
25-0825A0002323R.PL-00486_001 | 2025-08-25 10:52:53 | 2025-09-22 05:00 | 2025-10-03 13:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-PL-SE-000016] Linia 400 kV Stärnö-Słupsk Wierzbięcino AC/DC | 600 [MW] | Utrzymanie | {25969} | |
25-0909A0002323R.PL-00508_002 | 2025-09-12 12:59:26 | 2025-10-20 04:00 | 2025-10-31 22:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000006422G] Linia 220 kV Mokre-Zamość | 377 [MW] | Utrzymanie | {26706} | |
25-0908A0002323R.PL-00503_003 | 2025-09-12 12:59:42 | 2025-10-20 04:00 | 2025-11-14 14:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-PL-UA-00001K] Linia 220 kV Zamość-Dobrotwór | 381 [MW] | Utrzymanie | {26707} | |
24-1109A0002323R.PL-00816_035 | 2025-09-11 14:18:22 | 2025-09-08 06:00 | 2025-09-12 15:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-CZ-PL-00003C] Linia 220 kV Kopanina-Liskowiec | 400 [MW] | Utrzymanie | {26663} | |
24-1129A0002323R.PL-00907_010 | 2025-09-11 14:21:21 | 2025-11-01 06:00 | 2025-12-06 18:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T110000006813D] Linia 400 kV Krajnik-Plewiska tor 2 | 1 558 [MW] | Modernizacja | {26673} | |
25-0825A0002323R.PL-00484_004 | 2025-09-11 14:21:54 | 2025-09-22 05:00 | 2025-09-23 15:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000299J] Linia 400 kV Morzyczyn-Dunowo | 1 358 [MW] | Utrzymanie | {26675} | |
24-1109A0002323R.PL-00817_017 | 2025-09-11 14:22:42 | 2025-11-10 06:00 | 2025-11-15 18:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-PL-SK-00001W] Linia 400 kV Krosno Iskrzynia-Lemieszany tor 1 | 1 039 [MW] | Inne | {26678} | |
24-1109A0002323R.PL-00786_020 | 2025-09-11 14:25:06 | 2025-10-17 05:00 | 2025-10-23 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013236] Linia 400 kV Krajnik-Morzyczyn | 1 552 [MW] | Utrzymanie | {26687} | |
25-0909A0002323R.PL-00505_003 | 2025-09-11 14:22:26 | 2025-10-06 05:00 | 2025-10-06 15:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-PL-SK-00001W] Linia 400 kV Krosno Iskrzynia-Lemieszany tor 1 | 1 039 [MW] | Utrzymanie | {26677} | |
25-0906A0002323R.PL-00502_003 | 2025-09-11 14:21:38 | 2025-09-08 05:00 | 2025-09-12 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-DE-PL-000047] Linia 400 kV Krajnik-Vierraden tor 1 | 1 746 [MW] | Utrzymanie | {26674} | |
25-0903A0002323R.PL-00500_004 | 2025-09-11 14:17:50 | 2025-10-17 05:00 | 2025-10-23 15:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000299J] Linia 400 kV Morzyczyn-Dunowo | 1 358 [MW] | Utrzymanie | {26661} | |
25-0903A0002323R.PL-00499_004 | 2025-09-11 14:23:46 | 2025-10-24 07:00 | 2025-10-24 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013236] Linia 400 kV Krajnik-Morzyczyn | 1 552 [MW] | Utrzymanie | {26682} | |
25-0911A0002323R.PL-00516_002 | 2025-09-15 05:37:21 | 2025-09-15 06:00 | 2025-09-19 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-DE-PL-000047] Linia 400 kV Krajnik-Vierraden tor 1 | 1 746 [MW] | Utrzymanie | {26740} | |
24-1126A0002323R.PL-00879_019 | 2025-09-11 14:22:10 | 2025-11-27 06:00 | 2025-12-05 19:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000296P] Linia 400 kV Tarnów-Krosno Iskrzynia | 1 386 [MW] | Modernizacja | {26676} | |
24-1109A0002323R.PL-00801_017 | 2025-09-11 14:24:02 | 2025-11-10 06:00 | 2025-11-15 18:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-PL-SK-00002U] Linia 400 kV Krosno Iskrzynia-Lemieszany tor 2 | 1 039 [MW] | Inne | {26683} | |
24-1109A0002323R.PL-00805_034 | 2025-09-12 04:46:26 | 2025-09-08 05:00 | 2025-09-14 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-CZ-PL-00002E] Linia 220 kV Bujaków-Liskowiec | 400 [MW] | Utrzymanie | {26701} | |
25-0825A0002323R.PL-00485_007 | 2025-09-13 09:44:33 | 2025-09-05 05:00 | 2025-09-13 09:20 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T1100000068167] Linia 400 kV Mikułowa-Świebodzice | 1 558 [MW] | Utrzymanie | {26714} | |
25-0825A0002323R.PL-00483_007 | 2025-09-13 09:44:54 | 2025-09-05 05:00 | 2025-09-13 09:20 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000372Z] Linia 220 kV Mikułowa-Świebodzice tor 2 | 548 [MW] | Utrzymanie | {26715} | |
24-1129A0002323R.PL-00906_010 | 2025-09-11 14:22:58 | 2025-11-01 06:00 | 2025-12-06 14:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000006405G] Linia 220 kV Gorzów-Krajnik | 426 [MW] | Modernizacja | {26679} | |
24-1129A0002323R.PL-00908_010 | 2025-09-11 14:25:41 | 2025-11-01 06:00 | 2025-11-08 18:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013236] Linia 400 kV Krajnik-Morzyczyn | 1 552 [MW] | Modernizacja | {26689} | |
24-1126A0002323R.PL-00867_017 | 2025-09-11 14:24:18 | 2025-11-18 06:00 | 2025-11-24 18:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-PL-SK-00001W] Linia 400 kV Krosno Iskrzynia-Lemieszany tor 1 | 1 039 [MW] 1 039 [MW] 1 039 [MW] 1 039 [MW] 1 039 [MW] 1 039 [MW] 1 039 [MW] | Inne | {26684} | |
25-0903A0002323R.PL-00497_004 | 2025-09-11 14:24:34 | 2025-10-14 05:00 | 2025-10-16 18:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T1001C--00134X] Linia 400 kV Rzeszów-Chmielnicka | 1 500 [MW] 1 500 [MW] 1 500 [MW] | Utrzymanie | {26685} | |
25-0903A0002323R.PL-00498_004 | 2025-09-11 14:18:38 | 2025-10-13 07:00 | 2025-10-16 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013236] Linia 400 kV Krajnik-Morzyczyn | 1 552 [MW] 1 552 [MW] 1 552 [MW] 1 552 [MW] | Utrzymanie | {26664} | |
24-1129A0002323R.PL-00898_028 | 2025-09-15 05:11:33 | 2025-09-16 05:00 | 2025-09-21 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000001304A] Linia 400 kV Rzeszów-Krosno Iskrzynia | 1 358 [MW] 1 358 [MW] 1 358 [MW] 1 358 [MW] 1 358 [MW] 1 358 [MW] | Modernizacja | {26739} | |
25-0909A0002323R.PL-00506_003 | 2025-09-11 14:19:42 | 2025-10-07 08:00 | 2025-10-07 12:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-PL-SK-00002U] Linia 400 kV Krosno Iskrzynia-Lemieszany tor 2 | 1 039 [MW] | Utrzymanie | {26668} | |
24-1109A0002323R.PL-00800_017 | 2025-09-11 14:18:54 | 2025-11-17 06:00 | 2025-11-25 19:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-PL-SK-00002U] Linia 400 kV Krosno Iskrzynia-Lemieszany tor 2 | 1 039 [MW] | Modernizacja | {26665} | |
25-0914A0002323R.PL-00528_004 | 2025-09-14 13:44:58 | 2025-09-14 10:52 | 2025-09-14 13:20 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-PL-SE-000016] Linia 400 kV Stärnö-Słupsk Wierzbięcino AC/DC | 600 [MW] | Awaria | {26738} | |
25-0825A0002323R.PL-00480_006 | 2025-09-11 14:19:27 | 2025-09-23 05:00 | 2025-09-23 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000296P] Linia 400 kV Tarnów-Krosno Iskrzynia | 1 386 [MW] | Utrzymanie | {26667} | |
25-0909A0002323R.PL-00507_003 | 2025-09-11 14:21:05 | 2025-10-06 05:00 | 2025-10-15 18:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000001304A] Linia 400 kV Rzeszów-Krosno Iskrzynia | 1 358 [MW] | Utrzymanie | {26672} |